Draft Environmental Impact Statement Santa Margarita River Flood Control Project (P-010), Basilone Road Bridge Replacement Project (P-030), and Draft Clean Water Act 404(b)(1) Evaluation, Camp Pendleton, California

Draft Environmental Impact Statement Santa Margarita River Flood Control Project (P-010), Basilone Road Bridge Replacement Project (P-030), and Draft Clean Water Act 404(b)(1) Evaluation, Camp Pendleton, California
Author :
Publisher :
Total Pages : 595
Release :
ISBN-10 : OCLC:227850376
ISBN-13 :
Rating : 4/5 (76 Downloads)

Book Synopsis Draft Environmental Impact Statement Santa Margarita River Flood Control Project (P-010), Basilone Road Bridge Replacement Project (P-030), and Draft Clean Water Act 404(b)(1) Evaluation, Camp Pendleton, California by :

Download or read book Draft Environmental Impact Statement Santa Margarita River Flood Control Project (P-010), Basilone Road Bridge Replacement Project (P-030), and Draft Clean Water Act 404(b)(1) Evaluation, Camp Pendleton, California written by and published by . This book was released on 1997 with total page 595 pages. Available in PDF, EPUB and Kindle. Book excerpt: Marine Corps Base (MCB) Camp Pendleton and Marine Corps Air Station (MCAS) Camp Pendleton maintain and operate facilities and provide services to support operations of aviation activities and units of operational forces of the United States Marine Corps (USMC). MCB Camp Pendleton is the USMC's only west coast military installation where a comprehensive air, sea, and ground assault training scenario can be executed. Facilities and operations in the southern portion of MCB Camp Pendleton adjacent to the Santa Margarita River are located in the 100-year floodplain for the river. Heavy rainfall in 1993 resulted in the flooding of MCAS Camp Pendleton, portions of MCB Camp Pendleton and the destruction of Basilone Road Bridge. The readiness and ability to support the missions of MCB Camp Pendleton and MCAS Camp Pendleton were seriously jeopardized because of the flooding and resulting damage. The flood damage caused operations to cease in the flood damaged areas and reduced the ability of the installation to perform the required missions for a period of 7 months. The flooding threatened the safety of personnel working in a portion of MCB Camp Pendleton and MCAS Camp Pendleton. The flooding also damaged structures and facilities, including buildings in the historic Santa Margarita Ranch House complex, structures in the Chappo (22) Area, and Sewage Treatment Plant (STP) No. 3. To prevent future damage to property and disruption of essential operations, the MCB Camp Pendleton has proposed construction of a flood control project.


Draft Environmental Impact Statement Santa Margarita River Flood Control Project (P-010), Basilone Road Bridge Replacement Project (P-030), and Draft Clean Water Act 404(b)(1) Evaluation, Camp Pendleton, California Related Books

Draft Environmental Impact Statement Santa Margarita River Flood Control Project (P-010), Basilone Road Bridge Replacement Project (P-030), and Draft Clean Water Act 404(b)(1) Evaluation, Camp Pendleton, California
Language: en
Pages: 595
Authors:
Categories:
Type: BOOK - Published: 1997 - Publisher:

DOWNLOAD EBOOK

Marine Corps Base (MCB) Camp Pendleton and Marine Corps Air Station (MCAS) Camp Pendleton maintain and operate facilities and provide services to support operat
Marine Corps Base Camp Pendleton, Santa Margarita River Flood Control Project, Basilone Road Bridge Replacement
Language: en
Pages: 620
Final Environmental Impact Statement. Section 404 Clean Water Act Draft 404 (b) (1) Analysis and Public Interest Review for MILCON Projects P-010 and P-030
Language: en
Pages: 713
Authors: Marine corps base camp pendleton ca
Categories:
Type: BOOK - Published: 1997 - Publisher:

DOWNLOAD EBOOK

The United States Marine Corps (USMC) proposes to construct a flood control project including a levee and stormwater management systems to prevent damage to pro
Draft Environmental Impact Statement
Language: en
Pages:
Authors: United States. Army. Corps of Engineers. Los Angeles District
Categories: Environmental impact analysis
Type: BOOK - Published: 1997 - Publisher:

DOWNLOAD EBOOK

Final Environmental Impact Statement
Language: en
Pages:
Authors: United States. Army. Corps of Engineers. Los Angeles District
Categories: Camp Pendleton (Calif.)
Type: BOOK - Published: 1997 - Publisher:

DOWNLOAD EBOOK