Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)

Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)
Author :
Publisher : Createspace Independent Publishing Platform
Total Pages : 28
Release :
ISBN-10 : 1727876652
ISBN-13 : 9781727876659
Rating : 4/5 (52 Downloads)

Book Synopsis Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) by : The Law The Law Library

Download or read book Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) written by The Law The Law Library and published by Createspace Independent Publishing Platform. This book was released on 2018-10-15 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt: Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 The Federal Energy Regulatory Commission (Commission) is modifying the pro forma Small Generator Interconnection Agreement (SGIA). The pro forma SGIA establishes the terms and conditions under which public utilities must provide interconnection service to small generating facilities of no larger than 20 megawatts. The Commission is modifying the pro forma SGIA to require newly interconnecting small generating facilities to ride through abnormal frequency and voltage events and not disconnect during such events. The specific ride through settings must be consistent with Good Utility Practice and any standards and guidelines applied by the transmission provider to other generating facilities on a comparable basis. The Commission already requires generators interconnecting under the Large Generator Interconnection Agreement to meet such requirements, and it would be unduly discriminatory not to also impose these requirements on small generating facilities. The Commission concludes that newly interconnecting small generating facilities should have ride through requirements comparable to large generating facilities. This book contains: - The complete text of the Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section


Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) Related Books