Convergence and Divergence of Theory of Constraint(s) and Lean Manufacturing in Construction Projects

Convergence and Divergence of Theory of Constraint(s) and Lean Manufacturing in Construction Projects
Author :
Publisher : GRIN Verlag
Total Pages : 164
Release :
ISBN-10 : 9783346275271
ISBN-13 : 3346275272
Rating : 4/5 (71 Downloads)

Book Synopsis Convergence and Divergence of Theory of Constraint(s) and Lean Manufacturing in Construction Projects by : Aishwarya Fadnavis

Download or read book Convergence and Divergence of Theory of Constraint(s) and Lean Manufacturing in Construction Projects written by Aishwarya Fadnavis and published by GRIN Verlag. This book was released on 2020-10-19 with total page 164 pages. Available in PDF, EPUB and Kindle. Book excerpt: Master's Thesis from the year 2018 in the subject Art - Architecture / History of Construction, grade: Distinction, Queen's University Belfast, language: English, abstract: The purpose of the study is to provide effectively managed constraints by defining constraints that prevent their targets and thus to increase the profitability of firms. Identifying and removing constraints from bottleneck activities help to reduce uncertainties in construction processes and increases the transparency of project management. Various continuous improvement (CI) strategies have been developed and applied to improve manufacturing system performance. This paper studies the combination of two distinct strategies, Lean Manufacturing (LM) and Theory of Constraint(s) (TOC), for improving manufacturing system performance. The research includes reviews of these two methodologies and the implementation process involved in each strategy. Examination of the possibilities to improve manufacturing system performance through integration of these two strategies. The effectiveness of the integrated approach along with an examination of different factors, recommendations, and presentation of best possible management practices for the application of this integrated approach. In an organization, there are attempts to achieve multiple projects with common, shared resources; the work can be challenging. Managers might find themselves on project overload with continual resource shortages and difficulty in determining the most important tasks. The focus of the research is on the elimination of non-value added activities through an application of a management philosophy that identifies and eliminates the waste from each step in the production throughout the Value Stream. A comparative analysis is carried out through reviews and studies regarding Lean Process and TOC- application to determine the manager’s potential benefits like reduced production lead-time and lesser work-in-process inventory.


Convergence and Divergence of Theory of Constraint(s) and Lean Manufacturing in Construction Projects Related Books